TR-120A over Raccoon Creek
PoorPosted for loadClay County, Illinois · 4 MI NE Xenia · Structure no. 013306000000000
- Built
- 1922
- 103 years old
- Condition
- Poor
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 27 ft
- 1 main span
- Daily traffic
- 25
- 2021 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR-120A over Raccoon Creek is a steel stringer/multi-beam or girder carrying TR-120A over Raccoon Creek in Clay County, Illinois. It was built in 1922, so it is 103 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 25 vehicles a day, roughly 8% of them trucks, projected to reach 25 by 2046. The structure is 27 ft (8.2 m) long and 14 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
| Channel and channel protection | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR-120A over Raccoon Creek built?
It was built in 1922, making it 103 years old in 2025.
What condition is TR-120A over Raccoon Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in January 2023.
How much traffic does TR-120A over Raccoon Creek carry?
About 25 vehicles per day (2021 count), of which roughly 8% are trucks.
How long is TR-120A over Raccoon Creek?
The structure is 27 ft (8.2 m) long with a longest span of 25 ft (7.6 m) and a deck 14 ft wide.
Who owns TR-120A over Raccoon Creek?
It is owned by the Town or Township Highway Agency.