FAS-2705 (CH-4) over Big Muddy Creek
FairClay County, Illinois · 3 MI S Ingerham · Structure no. 013301900000000
- Built
- 1939
- 86 years old, rebuilt 1984
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 140 ft
- 3 main spans
- Daily traffic
- 250
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
FAS-2705 (CH-4) over Big Muddy Creek is a steel continuous stringer/multi-beam or girder carrying FAS-2705 (CH-4) over Big Muddy Creek in Clay County, Illinois. It was built in 1939 and reconstructed in 1984, so it is 86 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 250 vehicles a day, roughly 15% of them trucks, projected to reach 253 by 2046. The structure is 140 ft (42.8 m) long and 23 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS-2705 (CH-4) over Big Muddy Creek built?
It was built in 1939, making it 86 years old in 2025. It was reconstructed in 1984.
What condition is FAS-2705 (CH-4) over Big Muddy Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does FAS-2705 (CH-4) over Big Muddy Creek carry?
About 250 vehicles per day (2021 count), of which roughly 15% are trucks.
How long is FAS-2705 (CH-4) over Big Muddy Creek?
The structure is 140 ft (42.8 m) long with a longest span of 53 ft (16.3 m) and a deck 23 ft wide.
Who owns FAS-2705 (CH-4) over Big Muddy Creek?
It is owned by the County Highway Agency.