FAP 328 (us 45) over Seminary Creek
FairClay County, Illinois · 3.75 MI S JCT US 50 · Structure no. 013004300000000
- Built
- 2009
- 16 years old
- Condition
- Fair
- inspected May 2023
- Type
- Slab
- Concrete Continuous
- Length
- 102 ft
- 3 main spans
- Daily traffic
- 2,250
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 328 (us 45) over Seminary Creek is a concrete continuous slab carrying FAP 328 (us 45) over Seminary Creek in Clay County, Illinois. It was built in 2009, so it is 16 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,250 vehicles a day, roughly 16% of them trucks, projected to reach 2,374 by 2046. The structure is 102 ft (31.2 m) long and 43 ft wide. If it were closed, the detour would be 65.9 mi (106 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 328 (us 45) over Seminary Creek built?
It was built in 2009, making it 16 years old in 2025.
What condition is FAP 328 (us 45) over Seminary Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does FAP 328 (us 45) over Seminary Creek carry?
About 2,250 vehicles per day (2023 count), of which roughly 16% are trucks.
How long is FAP 328 (us 45) over Seminary Creek?
The structure is 102 ft (31.2 m) long with a longest span of 40 ft (12.2 m) and a deck 43 ft wide.
Who owns FAP 328 (us 45) over Seminary Creek?
It is owned by the State Highway Agency.