CH-3(FAS 692) over Sugar Creek
GoodClark County, Illinois · 2.5 MI N Darwin · Structure no. 012301100000000
- Built
- 1970
- 55 years old, rebuilt 2016
- Condition
- Good
- inspected February 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 81 ft
- 1 main span
- Daily traffic
- 125
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
CH-3(FAS 692) over Sugar Creek is a prestressed concrete box beam or girders - multiple carrying CH-3(FAS 692) over Sugar Creek in Clark County, Illinois. It was built in 1970 and reconstructed in 2016, so it is 55 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 125 vehicles a day, roughly 15% of them trucks, projected to reach 126 by 2046. The structure is 81 ft (24.7 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CH-3(FAS 692) over Sugar Creek built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2016.
What condition is CH-3(FAS 692) over Sugar Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does CH-3(FAS 692) over Sugar Creek carry?
About 125 vehicles per day (2021 count), of which roughly 15% are trucks.
How long is CH-3(FAS 692) over Sugar Creek?
The structure is 81 ft (24.7 m) long with a longest span of 79 ft (24 m) and a deck 30 ft wide.
Who owns CH-3(FAS 692) over Sugar Creek?
It is owned by the County Highway Agency.