Ill 1(FAP 332) over Big Creek
FairClark County, Illinois · 2 MI N Marshall · Structure no. 012001300000000
- Built
- 1954
- 71 years old, rebuilt 1998
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 210 ft
- 3 main spans
- Daily traffic
- 5,150
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Ill 1(FAP 332) over Big Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Ill 1(FAP 332) over Big Creek in Clark County, Illinois. It was built in 1954 and reconstructed in 1998, so it is 71 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,150 vehicles a day, roughly 15% of them trucks, projected to reach 5,252 by 2046. The structure is 210 ft (64 m) long and 39 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ill 1(FAP 332) over Big Creek built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1998.
What condition is Ill 1(FAP 332) over Big Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Ill 1(FAP 332) over Big Creek carry?
About 5,150 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is Ill 1(FAP 332) over Big Creek?
The structure is 210 ft (64 m) long with a longest span of 78 ft (23.8 m) and a deck 39 ft wide.
Who owns Ill 1(FAP 332) over Big Creek?
It is owned by the State Highway Agency.