Ch 10-FAS 732 over Bear Creek
FairChristian County, Illinois · 1 MI E Morrisonville · Structure no. 011338900000000
- Built
- 2002
- 23 years old
- Condition
- Fair
- inspected November 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 142 ft
- 3 main spans
- Daily traffic
- 500
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Ch 10-FAS 732 over Bear Creek is a prestressed concrete box beam or girders - multiple carrying Ch 10-FAS 732 over Bear Creek in Christian County, Illinois. It was built in 2002, so it is 23 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 500 vehicles a day, roughly 22% of them trucks, projected to reach 505 by 2046. The structure is 142 ft (43.3 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ch 10-FAS 732 over Bear Creek built?
It was built in 2002, making it 23 years old in 2025.
What condition is Ch 10-FAS 732 over Bear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Ch 10-FAS 732 over Bear Creek carry?
About 500 vehicles per day (2021 count), of which roughly 22% are trucks.
How long is Ch 10-FAS 732 over Bear Creek?
The structure is 142 ft (43.3 m) long with a longest span of 54 ft (16.5 m) and a deck 30 ft wide.
Who owns Ch 10-FAS 732 over Bear Creek?
It is owned by the County Highway Agency.