CH12-FAS 732 over Cotton Creek
FairChristian County, Illinois · 7.5 MI W Pana · Structure no. 011301300000000
- Built
- 1925
- 100 years old, rebuilt 1971
- Condition
- Fair
- inspected December 2024
- Type
- Slab
- Concrete
- Length
- 44 ft
- 1 main span
- Daily traffic
- 500
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
CH12-FAS 732 over Cotton Creek is a concrete slab carrying CH12-FAS 732 over Cotton Creek in Christian County, Illinois. It was built in 1925 and reconstructed in 1971, so it is 100 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 500 vehicles a day, roughly 35% of them trucks, projected to reach 505 by 2046. The structure is 44 ft (13.5 m) long and 39 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CH12-FAS 732 over Cotton Creek built?
It was built in 1925, making it 100 years old in 2025. It was reconstructed in 1971.
What condition is CH12-FAS 732 over Cotton Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does CH12-FAS 732 over Cotton Creek carry?
About 500 vehicles per day (2021 count), of which roughly 35% are trucks.
How long is CH12-FAS 732 over Cotton Creek?
The structure is 44 ft (13.5 m) long with a longest span of 29 ft (8.8 m) and a deck 39 ft wide.
Who owns CH12-FAS 732 over Cotton Creek?
It is owned by the County Highway Agency.