FAS 516(CH 32) over Spoon River
GoodChampaign County, Illinois · 3.2 MI S of Gifford · Structure no. 010459300000000
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 115 ft
- 3 main spans
- Daily traffic
- 525
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 516(CH 32) over Spoon River is a concrete stringer/multi-beam or girder carrying FAS 516(CH 32) over Spoon River in Champaign County, Illinois. It was built in 2023, so it is 2 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 525 vehicles a day, roughly 11% of them trucks, projected to reach 1,354 by 2042. The structure is 115 ft (35 m) long and 39 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 516(CH 32) over Spoon River built?
It was built in 2023, making it 2 years old in 2025.
What condition is FAS 516(CH 32) over Spoon River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does FAS 516(CH 32) over Spoon River carry?
About 525 vehicles per day (2021 count), of which roughly 11% are trucks.
How long is FAS 516(CH 32) over Spoon River?
The structure is 115 ft (35 m) long with a longest span of 48 ft (14.7 m) and a deck 39 ft wide.
Who owns FAS 516(CH 32) over Spoon River?
It is owned by the County Highway Agency.