US Bridges

FAU 7177 Lincoln a over Saline Br Drain Dt

Good

Champaign County, Illinois · N Edge of Urbana · Structure no. 010454100000000

Built
2010
15 years old
Condition
Good
inspected November 2022
Type
Slab
Concrete
Length
116 ft
3 main spans
Daily traffic
3,050
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU 7177 Lincoln a over Saline Br Drain Dt is a concrete slab carrying FAU 7177 Lincoln a over Saline Br Drain Dt in Champaign County, Illinois. It was built in 2010, so it is 15 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,050 vehicles a day, roughly 39% of them trucks, projected to reach 3,081 by 2046. The structure is 116 ft (35.4 m) long and 39 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesFAU 7177 Lincoln a
CrossesSaline Br Drain Dt
LocationN Edge of Urbana
Coordinates40.14288, -88.21994
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionNovember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length116 ft (35.4 m)
Longest span44 ft (13.4 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,050 (2021)
Projected traffic3,081 by 2046
Trucks39%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU 7177 Lincoln a over Saline Br Drain Dt built?

It was built in 2010, making it 15 years old in 2025.

What condition is FAU 7177 Lincoln a over Saline Br Drain Dt in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.

How much traffic does FAU 7177 Lincoln a over Saline Br Drain Dt carry?

About 3,050 vehicles per day (2021 count), of which roughly 39% are trucks.

How long is FAU 7177 Lincoln a over Saline Br Drain Dt?

The structure is 116 ft (35.4 m) long with a longest span of 44 ft (13.4 m) and a deck 39 ft wide.

Who owns FAU 7177 Lincoln a over Saline Br Drain Dt?

It is owned by the City or Municipal Highway Agency.