TR 130 over Stream
PoorChampaign County, Illinois · 5.2 MI NE Fisher · Structure no. 010438900000000
- Built
- 1991
- 34 years old
- Condition
- Poor
- inspected May 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 55 ft
- 1 main span
- Daily traffic
- 225
- 2021 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 130 over Stream is a prestressed concrete box beam or girders - multiple carrying TR 130 over Stream in Champaign County, Illinois. It was built in 1991, so it is 34 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 225 vehicles a day, roughly 1% of them trucks, projected to reach 227 by 2046. The structure is 55 ft (16.9 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 130 over Stream built?
It was built in 1991, making it 34 years old in 2025.
What condition is TR 130 over Stream in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in May 2023.
How much traffic does TR 130 over Stream carry?
About 225 vehicles per day (2021 count), of which roughly 1% are trucks.
How long is TR 130 over Stream?
The structure is 55 ft (16.9 m) long with a longest span of 51 ft (15.4 m) and a deck 28 ft wide.
Who owns TR 130 over Stream?
It is owned by the Town or Township Highway Agency.