US Bridges

TR 75 over Stream

Good

Champaign County, Illinois · 4.6 MI N Mahomet · Structure no. 010419000000000

Built
1982
43 years old
Condition
Good
inspected April 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
94 ft
3 main spans
Daily traffic
50
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 75 over Stream is a prestressed concrete box beam or girders - multiple carrying TR 75 over Stream in Champaign County, Illinois. It was built in 1982, so it is 43 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 51 by 2046. The structure is 94 ft (28.7 m) long and 26 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesTR 75
CrossesStream
Location4.6 MI N Mahomet
RouteCounty Highway 0
Coordinates40.25988, -88.39995
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length94 ft (28.7 m)
Longest span38 ft (11.6 m)
Deck width26 ft (8 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2021)
Projected traffic51 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 75 over Stream built?

It was built in 1982, making it 43 years old in 2025.

What condition is TR 75 over Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does TR 75 over Stream carry?

About 50 vehicles per day (2021 count).

How long is TR 75 over Stream?

The structure is 94 ft (28.7 m) long with a longest span of 38 ft (11.6 m) and a deck 26 ft wide.

Who owns TR 75 over Stream?

It is owned by the Town or Township Highway Agency.