US Bridges

FAU 7110(BRADLEY a over Stream

Fair

Champaign County, Illinois · Bradley W of Mattis · Structure no. 010405900000000

Built
1972
53 years old
Condition
Fair
inspected September 2024
Type
Culvert
Concrete Continuous
Length
30 ft
3 main spans
Daily traffic
15,500
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU 7110(BRADLEY a over Stream is a concrete continuous culvert carrying FAU 7110(BRADLEY a over Stream in Champaign County, Illinois. It was built in 1972, so it is 53 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 15,500 vehicles a day, roughly 5% of them trucks, projected to reach 15,756 by 2046. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFAU 7110(BRADLEY a
CrossesStream
LocationBradley W of Mattis
Coordinates40.12747, -88.28185
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.6 US tons
Inventory rating38.6 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span10 ft (3.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,500 (2024)
Projected traffic15,756 by 2046
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU 7110(BRADLEY a over Stream built?

It was built in 1972, making it 53 years old in 2025.

What condition is FAU 7110(BRADLEY a over Stream in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does FAU 7110(BRADLEY a over Stream carry?

About 15,500 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is FAU 7110(BRADLEY a over Stream?

The structure is 30 ft (9.1 m) long with a longest span of 10 ft (3.2 m).

Who owns FAU 7110(BRADLEY a over Stream?

It is owned by the City or Municipal Highway Agency.