US Bridges

TR 312 over Stream

Fair

Champaign County, Illinois · 3.2 MI SW Ogden · Structure no. 010332300000000

Built
1964
61 years old
Condition
Fair
inspected February 2025
Type
Channel Beam
Concrete
Length
24 ft
1 main span
Daily traffic
200
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 312 over Stream is a concrete channel beam carrying TR 312 over Stream in Champaign County, Illinois. It was built in 1964, so it is 61 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 200 vehicles a day, roughly 5% of them trucks, projected to reach 202 by 2046. The structure is 24 ft (7.3 m) long and 23 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesTR 312
CrossesStream
Location3.2 MI SW Ogden
RouteCounty Highway 0
Coordinates40.0769, -87.99452
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating50 US tons
Inventory rating30 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 15
Structure length24 ft (7.3 m)
Longest span23 ft (7.1 m)
Deck width23 ft (6.9 m)
Roadway width20 ft (6.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2021)
Projected traffic202 by 2046
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 312 over Stream built?

It was built in 1964, making it 61 years old in 2025.

What condition is TR 312 over Stream in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does TR 312 over Stream carry?

About 200 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is TR 312 over Stream?

The structure is 24 ft (7.3 m) long with a longest span of 23 ft (7.1 m) and a deck 23 ft wide.

Who owns TR 312 over Stream?

It is owned by the Town or Township Highway Agency.