TR 225 over Kaskaskia Ditch
FairChampaign County, Illinois · 4.8 MI W Savoy · Structure no. 010322100000000
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 46 ft
- 1 main span
- Daily traffic
- 150
- 2021 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 225 over Kaskaskia Ditch is a prestressed concrete box beam or girders - multiple carrying TR 225 over Kaskaskia Ditch in Champaign County, Illinois. It was built in 1969, so it is 56 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 150 vehicles a day, roughly 5% of them trucks, projected to reach 152 by 2046. The structure is 46 ft (13.9 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 225 over Kaskaskia Ditch built?
It was built in 1969, making it 56 years old in 2025.
What condition is TR 225 over Kaskaskia Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does TR 225 over Kaskaskia Ditch carry?
About 150 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is TR 225 over Kaskaskia Ditch?
The structure is 46 ft (13.9 m) long with a longest span of 43 ft (13.1 m) and a deck 24 ft wide.
Who owns TR 225 over Kaskaskia Ditch?
It is owned by the Town or Township Highway Agency.