Ill 49 (fap 836) over Salt Fork
GoodChampaign County, Illinois · 1.25 MI N of Homer · Structure no. 010028000000000
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 350 ft
- 4 main spans
- Daily traffic
- 3,200
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Ill 49 (fap 836) over Salt Fork is a prestressed concrete continuous stringer/multi-beam or girder carrying Ill 49 (fap 836) over Salt Fork in Champaign County, Illinois. It was built in 2005, so it is 20 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,200 vehicles a day, roughly 16% of them trucks, projected to reach 3,200 by 2046. The structure is 350 ft (106.7 m) long and 39 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ill 49 (fap 836) over Salt Fork built?
It was built in 2005, making it 20 years old in 2025.
What condition is Ill 49 (fap 836) over Salt Fork in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does Ill 49 (fap 836) over Salt Fork carry?
About 3,200 vehicles per day (2023 count), of which roughly 16% are trucks.
How long is Ill 49 (fap 836) over Salt Fork?
The structure is 350 ft (106.7 m) long with a longest span of 100 ft (30.5 m) and a deck 39 ft wide.
Who owns Ill 49 (fap 836) over Salt Fork?
It is owned by the State Highway Agency.