Garner Rd. over Jobs Creek
FairCass County, Illinois · 1.5 MI NE Virginia · Structure no. 009325700000000
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 36 ft
- 1 main span
- Daily traffic
- 150
- 2023 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Garner Rd. over Jobs Creek is a steel stringer/multi-beam or girder carrying Garner Rd. over Jobs Creek in Cass County, Illinois. It was built in 1980, so it is 45 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 150 vehicles a day, roughly 27% of them trucks, projected to reach 76 by 2046. The structure is 36 ft (11 m) long and 25 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Garner Rd. over Jobs Creek built?
It was built in 1980, making it 45 years old in 2025.
What condition is Garner Rd. over Jobs Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does Garner Rd. over Jobs Creek carry?
About 150 vehicles per day (2023 count), of which roughly 27% are trucks.
How long is Garner Rd. over Jobs Creek?
The structure is 36 ft (11 m) long with a longest span of 33 ft (10.1 m) and a deck 25 ft wide.
Who owns Garner Rd. over Jobs Creek?
It is owned by the Town or Township Highway Agency.