FAS 769 over Michael Hollow Creek
FairCalhoun County, Illinois · 4.75M E Hamburg · Structure no. 007304200000000
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected September 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 41 ft
- 1 main span
- Daily traffic
- 350
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
FAS 769 over Michael Hollow Creek is a prestressed concrete slab carrying FAS 769 over Michael Hollow Creek in Calhoun County, Illinois. It was built in 1984, so it is 41 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 350 vehicles a day, roughly 9% of them trucks, projected to reach 354 by 2046. The structure is 41 ft (12.5 m) long and 24 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 769 over Michael Hollow Creek built?
It was built in 1984, making it 41 years old in 2025.
What condition is FAS 769 over Michael Hollow Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does FAS 769 over Michael Hollow Creek carry?
About 350 vehicles per day (2022 count), of which roughly 9% are trucks.
How long is FAS 769 over Michael Hollow Creek?
The structure is 41 ft (12.5 m) long with a longest span of 37 ft (11.3 m) and a deck 24 ft wide.
Who owns FAS 769 over Michael Hollow Creek?
It is owned by the Town or Township Highway Agency.