MS-6050A (main St) over Walnut Ditch
GoodBureau County, Illinois · SW Edge of Walnut · Structure no. 006810000000000
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 98 ft
- 3 main spans
- Daily traffic
- 825
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
MS-6050A (main St) over Walnut Ditch is a steel continuous stringer/multi-beam or girder carrying MS-6050A (main St) over Walnut Ditch in Bureau County, Illinois. It was built in 2018, so it is 7 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 825 vehicles a day, roughly 11% of them trucks, projected to reach 833 by 2046. The structure is 98 ft (29.8 m) long and 33 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was MS-6050A (main St) over Walnut Ditch built?
It was built in 2018, making it 7 years old in 2025.
What condition is MS-6050A (main St) over Walnut Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does MS-6050A (main St) over Walnut Ditch carry?
About 825 vehicles per day (2020 count), of which roughly 11% are trucks.
How long is MS-6050A (main St) over Walnut Ditch?
The structure is 98 ft (29.8 m) long with a longest span of 35 ft (10.8 m) and a deck 33 ft wide.
Who owns MS-6050A (main St) over Walnut Ditch?
It is owned by the City or Municipal Highway Agency.