US Bridges

Township Road 238 over Crow Creek

Good

Bureau County, Illinois · 9 MI S of Tiskilwa · Structure no. 006435600000000

Built
2018
7 years old
Condition
Good
inspected November 2021
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
69 ft
1 main span
Daily traffic
25
2010 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Township Road 238 over Crow Creek is a prestressed concrete box beam or girders - multiple carrying Township Road 238 over Crow Creek in Bureau County, Illinois. It was built in 2018, so it is 7 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, projected to reach 25 by 2046. The structure is 69 ft (21 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTownship Road 238
CrossesCrow Creek
Location9 MI S of Tiskilwa
RouteCounty Highway 0
Coordinates41.16591, -89.48578
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating65.4 US tons
Inventory rating51 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length69 ft (21 m)
Longest span66 ft (20.2 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2010)
Projected traffic25 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Township Road 238 over Crow Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is Township Road 238 over Crow Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2021.

How much traffic does Township Road 238 over Crow Creek carry?

About 25 vehicles per day (2010 count).

How long is Township Road 238 over Crow Creek?

The structure is 69 ft (21 m) long with a longest span of 66 ft (20.2 m) and a deck 28 ft wide.

Who owns Township Road 238 over Crow Creek?

It is owned by the Town or Township Highway Agency.