TR 85 over Masters Creek
PoorClosed to trafficBureau County, Illinois · 3 MI SE of Ohio · Structure no. 006427200000000
- Built
- 1965
- 60 years old
- Condition
- Poor
- inspected November 2023
- Type
- Channel Beam
- Concrete
- Length
- 61 ft
- 3 main spans
- Daily traffic
- 25
- 2010 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 85 over Masters Creek is a concrete channel beam carrying TR 85 over Masters Creek in Bureau County, Illinois. It was built in 1965, so it is 60 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 2 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: closed to all traffic.
It carries about 25 vehicles a day, projected to reach 25 by 2046. The structure is 61 ft (18.6 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 2 Critical | Advanced deterioration of primary structural elements. Bridge may be closed until corrective action is taken. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 85 over Masters Creek built?
It was built in 1965, making it 60 years old in 2025.
What condition is TR 85 over Masters Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in November 2023.
How much traffic does TR 85 over Masters Creek carry?
About 25 vehicles per day (2010 count).
How long is TR 85 over Masters Creek?
The structure is 61 ft (18.6 m) long with a longest span of 20 ft (6.1 m) and a deck 26 ft wide.
Who owns TR 85 over Masters Creek?
It is owned by the Town or Township Highway Agency.