Township RD 60 B over Smith Ditch
GoodBureau County, Illinois · 3.5 Mi. NW Sheffield · Structure no. 006411100000000
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 58 ft
- 1 main span
- Daily traffic
- 75
- 2020 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Township RD 60 B over Smith Ditch is a prestressed concrete box beam or girders - multiple carrying Township RD 60 B over Smith Ditch in Bureau County, Illinois. It was built in 2018, so it is 7 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 75 vehicles a day, roughly 24% of them trucks, projected to reach 76 by 2046. The structure is 58 ft (17.7 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Township RD 60 B over Smith Ditch built?
It was built in 2018, making it 7 years old in 2025.
What condition is Township RD 60 B over Smith Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Township RD 60 B over Smith Ditch carry?
About 75 vehicles per day (2020 count), of which roughly 24% are trucks.
How long is Township RD 60 B over Smith Ditch?
The structure is 58 ft (17.7 m) long with a longest span of 55 ft (16.8 m) and a deck 24 ft wide.
Who owns Township RD 60 B over Smith Ditch?
It is owned by the Town or Township Highway Agency.