FAS 1246/CH 24 over Branch of Pond Creek
GoodBureau County, Illinois · 2.0 MI S Wyanet · Structure no. 006310400000000
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 48 ft
- 1 main span
- Daily traffic
- 325
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 1246/CH 24 over Branch of Pond Creek is a prestressed concrete box beam or girders - multiple carrying FAS 1246/CH 24 over Branch of Pond Creek in Bureau County, Illinois. It was built in 2021, so it is 4 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 325 vehicles a day, roughly 8% of them trucks, projected to reach 328 by 2046. The structure is 48 ft (14.6 m) long and 30 ft wide. If it were closed, the detour would be 16.2 mi (26 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 1246/CH 24 over Branch of Pond Creek built?
It was built in 2021, making it 4 years old in 2025.
What condition is FAS 1246/CH 24 over Branch of Pond Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does FAS 1246/CH 24 over Branch of Pond Creek carry?
About 325 vehicles per day (2020 count), of which roughly 8% are trucks.
How long is FAS 1246/CH 24 over Branch of Pond Creek?
The structure is 48 ft (14.6 m) long with a longest span of 45 ft (13.7 m) and a deck 30 ft wide.
Who owns FAS 1246/CH 24 over Branch of Pond Creek?
It is owned by the County Highway Agency.