FAS 253/CH 10 over Bureau CO Ditch
FairBureau County, Illinois · 6 Mi. N. of Mineral · Structure no. 006307100000000
- Built
- 2005
- 20 years old
- Condition
- Fair
- inspected March 2023
- Type
- Slab
- Concrete
- Length
- 29 ft
- 1 main span
- Daily traffic
- 200
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 253/CH 10 over Bureau CO Ditch is a concrete slab carrying FAS 253/CH 10 over Bureau CO Ditch in Bureau County, Illinois. It was built in 2005, so it is 20 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 200 vehicles a day, roughly 22% of them trucks, projected to reach 202 by 2046. The structure is 29 ft (8.8 m) long and 33 ft wide. If it were closed, the detour would be 32.9 mi (53 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 253/CH 10 over Bureau CO Ditch built?
It was built in 2005, making it 20 years old in 2025.
What condition is FAS 253/CH 10 over Bureau CO Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does FAS 253/CH 10 over Bureau CO Ditch carry?
About 200 vehicles per day (2020 count), of which roughly 22% are trucks.
How long is FAS 253/CH 10 over Bureau CO Ditch?
The structure is 29 ft (8.8 m) long with a longest span of 26 ft (8 m) and a deck 33 ft wide.
Who owns FAS 253/CH 10 over Bureau CO Ditch?
It is owned by the County Highway Agency.