Ch 10/FAS 782 over Trib Hurricane Ck
FairBond County, Illinois · 1.25 MI S Mulb Grove · Structure no. 003304500000000
- Built
- 1992
- 33 years old
- Condition
- Fair
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 87 ft
- 3 main spans
- Daily traffic
- 525
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Ch 10/FAS 782 over Trib Hurricane Ck is a prestressed concrete box beam or girders - multiple carrying Ch 10/FAS 782 over Trib Hurricane Ck in Bond County, Illinois. It was built in 1992, so it is 33 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 525 vehicles a day, roughly 11% of them trucks, projected to reach 530 by 2046. The structure is 87 ft (26.4 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ch 10/FAS 782 over Trib Hurricane Ck built?
It was built in 1992, making it 33 years old in 2025.
What condition is Ch 10/FAS 782 over Trib Hurricane Ck in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Ch 10/FAS 782 over Trib Hurricane Ck carry?
About 525 vehicles per day (2020 count), of which roughly 11% are trucks.
How long is Ch 10/FAS 782 over Trib Hurricane Ck?
The structure is 87 ft (26.4 m) long with a longest span of 35 ft (10.7 m) and a deck 28 ft wide.
Who owns Ch 10/FAS 782 over Trib Hurricane Ck?
It is owned by the County Highway Agency.