Ch 8/FAS 782 over Owl Creek
PoorBond County, Illinois · N Corp Limt Mulberry · Structure no. 003303000000000
- Built
- 1947
- 78 years old
- Condition
- Poor
- inspected January 2024
- Type
- Culvert
- Concrete
- Length
- 31 ft
- 2 main spans
- Daily traffic
- 1,100
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Ch 8/FAS 782 over Owl Creek is a concrete culvert carrying Ch 8/FAS 782 over Owl Creek in Bond County, Illinois. It was built in 1947, so it is 78 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 1,100 vehicles a day, roughly 16% of them trucks, projected to reach 1,111 by 2046. The structure is 31 ft (9.4 m) long. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Culvert | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ch 8/FAS 782 over Owl Creek built?
It was built in 1947, making it 78 years old in 2025.
What condition is Ch 8/FAS 782 over Owl Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in January 2024.
How much traffic does Ch 8/FAS 782 over Owl Creek carry?
About 1,100 vehicles per day (2020 count), of which roughly 16% are trucks.
How long is Ch 8/FAS 782 over Owl Creek?
The structure is 31 ft (9.4 m) long with a longest span of 12 ft (3.7 m).
Who owns Ch 8/FAS 782 over Owl Creek?
It is owned by the County Highway Agency.