US Bridges

Stanley-Warm Lake over No Data Entered

Good

Valley County, Idaho · 2 Mi. E. of Bruce Meadows · Structure no. 040205000036679

Built
2023
2 years old
Condition
Good
inspected September 2023
Type
Slab
Prestressed Concrete
Length
34 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

Stanley-Warm Lake over No Data Entered is a prestressed concrete slab carrying Stanley-Warm Lake over No Data Entered in Valley County, Idaho. It was built in 2023, so it is 2 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 34 ft (10.4 m) long and 24 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesStanley-Warm Lake
CrossesNo Data Entered
Location2 Mi. E. of Bruce Meadows
RouteFederal Lands Road 579
StateIdaho
Coordinates44.40464, -115.28596
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation*: *
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating—
Inventory rating—

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length34 ft (10.4 m)
Longest span33 ft (10.1 m)
Deck width24 ft (7.3 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure2
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Stanley-Warm Lake over No Data Entered built?

It was built in 2023, making it 2 years old in 2025.

What condition is Stanley-Warm Lake over No Data Entered in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Stanley-Warm Lake over No Data Entered carry?

About 50 vehicles per day (latest count).

How long is Stanley-Warm Lake over No Data Entered?

The structure is 34 ft (10.4 m) long with a longest span of 33 ft (10.1 m) and a deck 24 ft wide.

Who owns Stanley-Warm Lake over No Data Entered?

It is owned by the U.S. Forest Service.