N 2700 E over Main Canal
FairTwin Falls County, Idaho · 3.0 E 1.0 N Hollister · Structure no. 000000000025523
- Built
- 1965
- 60 years old, rebuilt 1985
- Condition
- Fair
- inspected February 2023
- Type
- Slab
- Concrete
- Length
- 25 ft
- 1 main span
- Daily traffic
- 460
- 2023 count
- Owner
- Local
- Other Local Agency
About this bridge
N 2700 E over Main Canal is a concrete slab carrying N 2700 E over Main Canal in Twin Falls County, Idaho. It was built in 1965 and reconstructed in 1985, so it is 60 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 460 vehicles a day, roughly 18% of them trucks, projected to reach 690 by 2042. The structure is 25 ft (7.6 m) long and 32 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N 2700 E over Main Canal built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1985.
What condition is N 2700 E over Main Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does N 2700 E over Main Canal carry?
About 460 vehicles per day (2023 count), of which roughly 18% are trucks.
How long is N 2700 E over Main Canal?
The structure is 25 ft (7.6 m) long with a longest span of 23 ft (7 m) and a deck 32 ft wide.
Who owns N 2700 E over Main Canal?
It is owned by the Other Local Agency.