Estep Lane over Bannock Creek;nw Pauline
FairPower County, Idaho · 0.9 N. 0.8 W. Pauline · Structure no. 000000000023480
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected April 2021
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 54 ft
- 1 main span
- Daily traffic
- 20
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Estep Lane over Bannock Creek;nw Pauline is a prestressed concrete tee beam carrying Estep Lane over Bannock Creek;nw Pauline in Power County, Idaho. It was built in 1981, so it is 44 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 20 vehicles a day, roughly 10% of them trucks, projected to reach 30 by 2039. The structure is 54 ft (16.5 m) long and 30 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Estep Lane over Bannock Creek;nw Pauline built?
It was built in 1981, making it 44 years old in 2025.
What condition is Estep Lane over Bannock Creek;nw Pauline in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2021.
How much traffic does Estep Lane over Bannock Creek;nw Pauline carry?
About 20 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is Estep Lane over Bannock Creek;nw Pauline?
The structure is 54 ft (16.5 m) long with a longest span of 52 ft (15.8 m) and a deck 30 ft wide.
Who owns Estep Lane over Bannock Creek;nw Pauline?
It is owned by the County Highway Agency.