US Bridges

200 West Road over A Canal

Good

Minidoka County, Idaho · 0.7 S. 3.6 E. Heyburn · Structure no. 000000000025143

Built
2020
5 years old
Condition
Good
inspected April 2022
Type
Frame
Concrete
Length
22 ft
1 main span
Daily traffic
800
2023 count
Owner
County
County Highway Agency

About this bridge

200 West Road over A Canal is a concrete frame carrying 200 West Road over A Canal in Minidoka County, Idaho. It was built in 2020, so it is 5 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 800 vehicles a day, roughly 24% of them trucks, projected to reach 1,200 by 2040. The structure is 22 ft (6.7 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries200 West Road
CrossesA Canal
Location0.7 S. 3.6 E. Heyburn
RouteCounty Highway 0
StateIdaho
Coordinates42.56044, -113.70517
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.8 US tons
Inventory rating40 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length22 ft (6.7 m)
Longest span20 ft (6.2 m)
Deck width36 ft (11 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic800 (2023)
Projected traffic1,200 by 2040
Trucks24%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 200 West Road over A Canal built?

It was built in 2020, making it 5 years old in 2025.

What condition is 200 West Road over A Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2022.

How much traffic does 200 West Road over A Canal carry?

About 800 vehicles per day (2023 count), of which roughly 24% are trucks.

How long is 200 West Road over A Canal?

The structure is 22 ft (6.7 m) long with a longest span of 20 ft (6.2 m) and a deck 36 ft wide.

Who owns 200 West Road over A Canal?

It is owned by the County Highway Agency.