Built
1971
54 years old
Condition
Fair
inspected March 2024
Type
Slab
Concrete
Length
26 ft
1 main span
Daily traffic
220
2023 count
Owner
Local
Other Local Agency

About this bridge

750 East Road over Dietrich Canal is a concrete slab carrying 750 East Road over Dietrich Canal in Lincoln County, Idaho. It was built in 1971, so it is 54 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 220 vehicles a day, roughly 5% of them trucks, projected to reach 330 by 2042. The structure is 26 ft (7.9 m) long and 25 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries750 East Road
CrossesDietrich Canal
Location0.7 N. 0.5 E. Dietrich
RouteCounty Highway 0
StateIdaho
Coordinates42.92011, -114.25575
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating30 US tons
Inventory rating18 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadH 15
Structure length26 ft (7.9 m)
Longest span25 ft (7.6 m)
Deck width25 ft (7.7 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic220 (2023)
Projected traffic330 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$328,000 (2018 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was 750 East Road over Dietrich Canal built?

It was built in 1971, making it 54 years old in 2025.

What condition is 750 East Road over Dietrich Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does 750 East Road over Dietrich Canal carry?

About 220 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is 750 East Road over Dietrich Canal?

The structure is 26 ft (7.9 m) long with a longest span of 25 ft (7.6 m) and a deck 25 ft wide.

Who owns 750 East Road over Dietrich Canal?

It is owned by the Other Local Agency.