US Bridges

650 West Road over Milner Gooding Canal

Good

Lincoln County, Idaho · 6.9 N. 6.4 W. Shoshone · Structure no. 000000000024951

Built
2024
1 years old
Condition
Good
inspected November 2024
Type
Frame
Concrete
Length
31 ft
1 main span
Daily traffic
100
2024 count
Owner
Local
Other Local Agency

About this bridge

650 West Road over Milner Gooding Canal is a concrete frame carrying 650 West Road over Milner Gooding Canal in Lincoln County, Idaho. It was built in 2024, so it is 1 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 20% of them trucks, projected to reach 150 by 2042. The structure is 31 ft (9.3 m) long and 38 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries650 West Road
CrossesMilner Gooding Canal
Location6.9 N. 6.4 W. Shoshone
RouteCounty Highway 0
StateIdaho
Coordinates43.03539, -114.53522
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46 US tons
Inventory rating36 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckOther
Main spans1
Design loadHL 93
Structure length31 ft (9.3 m)
Longest span29 ft (8.7 m)
Deck width38 ft (11.6 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2024)
Projected traffic150 by 2042
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 650 West Road over Milner Gooding Canal built?

It was built in 2024, making it 1 years old in 2025.

What condition is 650 West Road over Milner Gooding Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does 650 West Road over Milner Gooding Canal carry?

About 100 vehicles per day (2024 count), of which roughly 20% are trucks.

How long is 650 West Road over Milner Gooding Canal?

The structure is 31 ft (9.3 m) long with a longest span of 29 ft (8.7 m) and a deck 38 ft wide.

Who owns 650 West Road over Milner Gooding Canal?

It is owned by the Other Local Agency.