Stc 4771;SOUTHWICK over Potlatch River
GoodLatah County, Idaho · 0.7 N. 0.6 E. Kendrick · Structure no. 000000000020266
- Built
- 1995
- 30 years old
- Condition
- Good
- inspected September 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 145 ft
- 1 main span
- Daily traffic
- 700
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Stc 4771;SOUTHWICK over Potlatch River is a prestressed concrete tee beam carrying Stc 4771;SOUTHWICK over Potlatch River in Latah County, Idaho. It was built in 1995, so it is 30 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 700 vehicles a day, roughly 23% of them trucks, projected to reach 1,050 by 2042. The structure is 145 ft (44.2 m) long and 29 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stc 4771;SOUTHWICK over Potlatch River built?
It was built in 1995, making it 30 years old in 2025.
What condition is Stc 4771;SOUTHWICK over Potlatch River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Stc 4771;SOUTHWICK over Potlatch River carry?
About 700 vehicles per day (2023 count), of which roughly 23% are trucks.
How long is Stc 4771;SOUTHWICK over Potlatch River?
The structure is 145 ft (44.2 m) long with a longest span of 142 ft (43.3 m) and a deck 29 ft wide.
Who owns Stc 4771;SOUTHWICK over Potlatch River?
It is owned by the County Highway Agency.