US Bridges

SH 9 over Big Bear Creek

Good

Latah County, Idaho · 3.2 Nw. Deary · Structure no. 000000000010275

Built
1982
43 years old
Condition
Good
inspected July 2022
Type
Tee Beam
Prestressed Concrete
Length
51 ft
1 main span
Daily traffic
960
2023 count
Owner
State
State Highway Agency

About this bridge

SH 9 over Big Bear Creek is a prestressed concrete tee beam carrying SH 9 over Big Bear Creek in Latah County, Idaho. It was built in 1982, so it is 43 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 960 vehicles a day, roughly 23% of them trucks, projected to reach 1,440 by 2042. The structure is 51 ft (15.5 m) long and 34 ft wide. If it were closed, the detour would be 37.3 mi (60 km).

CarriesSH 9
CrossesBig Bear Creek
Location3.2 Nw. Deary
RouteState Highway 9
StateIdaho
Coordinates46.82261, -116.61644
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65 US tons
Inventory rating39 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length51 ft (15.5 m)
Longest span51 ft (15.5 m)
Deck width34 ft (10.3 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic960 (2023)
Projected traffic1,440 by 2042
Trucks23%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed37.3 mi (60 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 9 over Big Bear Creek built?

It was built in 1982, making it 43 years old in 2025.

What condition is SH 9 over Big Bear Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2022.

How much traffic does SH 9 over Big Bear Creek carry?

About 960 vehicles per day (2023 count), of which roughly 23% are trucks.

How long is SH 9 over Big Bear Creek?

The structure is 51 ft (15.5 m) long with a longest span of 51 ft (15.5 m) and a deck 34 ft wide.

Who owns SH 9 over Big Bear Creek?

It is owned by the State Highway Agency.