US Bridges

SH 8 over S.Fk.Palouse River

Good

Latah County, Idaho · 2.2 E. Moscow Ecl · Structure no. 000000000010221

Built
2002
23 years old
Condition
Good
inspected July 2021
Type
Tee Beam
Prestressed Concrete
Length
55 ft
1 main span
Daily traffic
5,300
2023 count
Owner
State
State Highway Agency

About this bridge

SH 8 over S.Fk.Palouse River is a prestressed concrete tee beam carrying SH 8 over S.Fk.Palouse River in Latah County, Idaho. It was built in 2002, so it is 23 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,300 vehicles a day, roughly 8% of them trucks, projected to reach 7,950 by 2042. The structure is 55 ft (16.8 m) long and 49 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSH 8
CrossesS.Fk.Palouse River
Location2.2 E. Moscow Ecl
RouteState Highway 8
StateIdaho
Coordinates46.72292, -116.94747
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78 US tons
Inventory rating41 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length55 ft (16.8 m)
Longest span52 ft (15.8 m)
Deck width49 ft (15 m)
Roadway width47 ft (14.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,300 (2023)
Projected traffic7,950 by 2042
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 8 over S.Fk.Palouse River built?

It was built in 2002, making it 23 years old in 2025.

What condition is SH 8 over S.Fk.Palouse River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2021.

How much traffic does SH 8 over S.Fk.Palouse River carry?

About 5,300 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is SH 8 over S.Fk.Palouse River?

The structure is 55 ft (16.8 m) long with a longest span of 52 ft (15.8 m) and a deck 49 ft wide.

Who owns SH 8 over S.Fk.Palouse River?

It is owned by the State Highway Agency.