Stc 7185;APPLEWAY over Appleway Ped Op
FairKootenai County, Idaho · In Coeur Dalene;appleway · Structure no. 000000000030440
- Built
- 1971
- 54 years old
- Condition
- Fair
- inspected June 2023
- Type
- Tee Beam
- Concrete
- Length
- 114 ft
- 3 main spans
- Daily traffic
- 3,600
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Stc 7185;APPLEWAY over Appleway Ped Op is a concrete tee beam carrying Stc 7185;APPLEWAY over Appleway Ped Op in Kootenai County, Idaho. It was built in 1971, so it is 54 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,600 vehicles a day, roughly 2% of them trucks, projected to reach 5,400 by 2042. The structure is 114 ft (34.7 m) long and 50 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stc 7185;APPLEWAY over Appleway Ped Op built?
It was built in 1971, making it 54 years old in 2025.
What condition is Stc 7185;APPLEWAY over Appleway Ped Op in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Stc 7185;APPLEWAY over Appleway Ped Op carry?
About 3,600 vehicles per day (2023 count), of which roughly 2% are trucks.
How long is Stc 7185;APPLEWAY over Appleway Ped Op?
The structure is 114 ft (34.7 m) long with a longest span of 37 ft (11.3 m) and a deck 50 ft wide.
Who owns Stc 7185;APPLEWAY over Appleway Ped Op?
It is owned by the City or Municipal Highway Agency.