Yellowstone Trail over I90;YELLOWSTONE Trail Gs
FairKootenai County, Idaho · 2.5S. 2.5E. Coeur Dalene · Structure no. 000000000016898
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected March 2021
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 270 ft
- 2 main spans
- Daily traffic
- 350
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Yellowstone Trail over I90;YELLOWSTONE Trail Gs is a prestressed concrete continuous box beam or girders - single or spread carrying Yellowstone Trail over I90;YELLOWSTONE Trail Gs in Kootenai County, Idaho. It was built in 1991, so it is 34 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 350 vehicles a day, roughly 14% of them trucks, projected to reach 525 by 2042. The structure is 270 ft (82.3 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Yellowstone Trail over I90;YELLOWSTONE Trail Gs built?
It was built in 1991, making it 34 years old in 2025.
What condition is Yellowstone Trail over I90;YELLOWSTONE Trail Gs in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2021.
How much traffic does Yellowstone Trail over I90;YELLOWSTONE Trail Gs carry?
About 350 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is Yellowstone Trail over I90;YELLOWSTONE Trail Gs?
The structure is 270 ft (82.3 m) long with a longest span of 150 ft (45.7 m) and a deck 34 ft wide.
Who owns Yellowstone Trail over I90;YELLOWSTONE Trail Gs?
It is owned by the State Highway Agency.