US Bridges

SH 3 over Willow Creek

Good

Kootenai County, Idaho · 10.2 S. Rose Lake · Structure no. 000000000010126

Built
2014
11 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
55 ft
1 main span
Daily traffic
1,900
2023 count
Owner
State
State Highway Agency

About this bridge

SH 3 over Willow Creek is a prestressed concrete stringer/multi-beam or girder carrying SH 3 over Willow Creek in Kootenai County, Idaho. It was built in 2014, so it is 11 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,900 vehicles a day, roughly 17% of them trucks, projected to reach 2,850 by 2042. The structure is 55 ft (16.8 m) long and 40 ft wide. If it were closed, the detour would be 23 mi (37 km).

CarriesSH 3
CrossesWillow Creek
Location10.2 S. Rose Lake
RouteState Highway 3
StateIdaho
Coordinates47.45608, -116.60306
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.5 US tons
Inventory rating44.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length55 ft (16.8 m)
Longest span52 ft (15.8 m)
Deck width40 ft (12.2 m)
Roadway width37 ft (11.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,900 (2023)
Projected traffic2,850 by 2042
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed23 mi (37 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 3 over Willow Creek built?

It was built in 2014, making it 11 years old in 2025.

What condition is SH 3 over Willow Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does SH 3 over Willow Creek carry?

About 1,900 vehicles per day (2023 count), of which roughly 17% are trucks.

How long is SH 3 over Willow Creek?

The structure is 55 ft (16.8 m) long with a longest span of 52 ft (15.8 m) and a deck 40 ft wide.

Who owns SH 3 over Willow Creek?

It is owned by the State Highway Agency.