STC2768;MILNER Rd. over T.F.Northside Main Cnl
FairJerome County, Idaho · 4.6 S. 6.0 E. Hazelton · Structure no. 000000000024550
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected March 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 65 ft
- 1 main span
- Daily traffic
- 360
- 2023 count
- Owner
- Local
- Other Local Agency
About this bridge
STC2768;MILNER Rd. over T.F.Northside Main Cnl is a prestressed concrete tee beam carrying STC2768;MILNER Rd. over T.F.Northside Main Cnl in Jerome County, Idaho. It was built in 1986, so it is 39 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 360 vehicles a day, roughly 9% of them trucks, projected to reach 540 by 2042. The structure is 65 ft (19.8 m) long and 34 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was STC2768;MILNER Rd. over T.F.Northside Main Cnl built?
It was built in 1986, making it 39 years old in 2025.
What condition is STC2768;MILNER Rd. over T.F.Northside Main Cnl in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does STC2768;MILNER Rd. over T.F.Northside Main Cnl carry?
About 360 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is STC2768;MILNER Rd. over T.F.Northside Main Cnl?
The structure is 65 ft (19.8 m) long with a longest span of 64 ft (19.5 m) and a deck 34 ft wide.
Who owns STC2768;MILNER Rd. over T.F.Northside Main Cnl?
It is owned by the Other Local Agency.