US Bridges

STC2754;S. Lincoln over N Canal

Good

Jerome County, Idaho · 3.2 S. Jerome · Structure no. 000000000019490

Built
1983
42 years old
Condition
Good
inspected November 2022
Type
Slab
Prestressed Concrete
Length
24 ft
1 main span
Daily traffic
5,900
2023 count
Owner
Local
Other Local Agency

About this bridge

STC2754;S. Lincoln over N Canal is a prestressed concrete slab carrying STC2754;S. Lincoln over N Canal in Jerome County, Idaho. It was built in 1983, so it is 42 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,900 vehicles a day, roughly 11% of them trucks, projected to reach 8,850 by 2042. The structure is 24 ft (7.3 m) long and 60 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSTC2754;S. Lincoln
CrossesN Canal
Location3.2 S. Jerome
RouteCounty Highway 2754
StateIdaho
Coordinates42.67739, -114.51844
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating43 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length24 ft (7.3 m)
Longest span23 ft (7 m)
Deck width60 ft (18.3 m)
Roadway width58 ft (17.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,900 (2023)
Projected traffic8,850 by 2042
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was STC2754;S. Lincoln over N Canal built?

It was built in 1983, making it 42 years old in 2025.

What condition is STC2754;S. Lincoln over N Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.

How much traffic does STC2754;S. Lincoln over N Canal carry?

About 5,900 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is STC2754;S. Lincoln over N Canal?

The structure is 24 ft (7.3 m) long with a longest span of 23 ft (7 m) and a deck 60 ft wide.

Who owns STC2754;S. Lincoln over N Canal?

It is owned by the Other Local Agency.