US Bridges

E 200 N over Burgess Canal

Fair

Jefferson County, Idaho · 1.1 S. 3.6 W. Rigby · Structure no. 000000000032550

Built
1970
55 years old
Condition
Fair
inspected April 2024
Type
Tee Beam
Prestressed Concrete
Length
40 ft
1 main span
Daily traffic
480
2023 count
Owner
County
County Highway Agency

About this bridge

E 200 N over Burgess Canal is a prestressed concrete tee beam carrying E 200 N over Burgess Canal in Jefferson County, Idaho. It was built in 1970, so it is 55 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 480 vehicles a day, roughly 10% of them trucks, projected to reach 720 by 2039. The structure is 40 ft (12.2 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesE 200 N
CrossesBurgess Canal
Location1.1 S. 3.6 W. Rigby
RouteCounty Highway 0
StateIdaho
Coordinates43.65536, -111.98903
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating38 US tons
Inventory rating23 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length40 ft (12.2 m)
Longest span39 ft (11.9 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic480 (2023)
Projected traffic720 by 2039
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$530,000 (2020 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was E 200 N over Burgess Canal built?

It was built in 1970, making it 55 years old in 2025.

What condition is E 200 N over Burgess Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does E 200 N over Burgess Canal carry?

About 480 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is E 200 N over Burgess Canal?

The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 28 ft wide.

Who owns E 200 N over Burgess Canal?

It is owned by the County Highway Agency.