N 1300 E Rd(byrne) over Owsley Canal;s Terreton
FairJefferson County, Idaho · 0.9 S. Terreton · Structure no. 000000000032395
- Built
- 1976
- 49 years old
- Condition
- Fair
- inspected March 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 32 ft
- 1 main span
- Daily traffic
- 40
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
N 1300 E Rd(byrne) over Owsley Canal;s Terreton is a prestressed concrete tee beam carrying N 1300 E Rd(byrne) over Owsley Canal;s Terreton in Jefferson County, Idaho. It was built in 1976, so it is 49 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 40 vehicles a day, roughly 10% of them trucks, projected to reach 60 by 2039. The structure is 32 ft (9.8 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N 1300 E Rd(byrne) over Owsley Canal;s Terreton built?
It was built in 1976, making it 49 years old in 2025.
What condition is N 1300 E Rd(byrne) over Owsley Canal;s Terreton in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does N 1300 E Rd(byrne) over Owsley Canal;s Terreton carry?
About 40 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is N 1300 E Rd(byrne) over Owsley Canal;s Terreton?
The structure is 32 ft (9.8 m) long with a longest span of 31 ft (9.4 m) and a deck 28 ft wide.
Who owns N 1300 E Rd(byrne) over Owsley Canal;s Terreton?
It is owned by the County Highway Agency.