US Bridges

I 15 Sbl over Market Lake Canal

Fair

Jefferson County, Idaho · 0.3 S. Roberts · Structure no. 000000000011835

Built
1968
57 years old
Condition
Fair
inspected March 2023
Type
Tee Beam
Concrete
Length
52 ft
1 main span
Daily traffic
3,050
2023 count
Owner
State
State Highway Agency

About this bridge

I 15 Sbl over Market Lake Canal is a concrete tee beam carrying I 15 Sbl over Market Lake Canal in Jefferson County, Idaho. It was built in 1968, so it is 57 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,050 vehicles a day, roughly 31% of them trucks, projected to reach 4,575 by 2042. The structure is 52 ft (15.8 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 15 Sbl
CrossesMarket Lake Canal
Location0.3 S. Roberts
RouteInterstate 15
StateIdaho
Coordinates43.71328, -112.13291
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.9 US tons
Inventory rating37 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length52 ft (15.8 m)
Longest span50 ft (15.2 m)
Deck width45 ft (13.7 m)
Roadway width42 ft (12.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,050 (2023)
Projected traffic4,575 by 2042
Trucks31%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$759,000 (2019 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was I 15 Sbl over Market Lake Canal built?

It was built in 1968, making it 57 years old in 2025.

What condition is I 15 Sbl over Market Lake Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does I 15 Sbl over Market Lake Canal carry?

About 3,050 vehicles per day (2023 count), of which roughly 31% are trucks.

How long is I 15 Sbl over Market Lake Canal?

The structure is 52 ft (15.8 m) long with a longest span of 50 ft (15.2 m) and a deck 45 ft wide.

Who owns I 15 Sbl over Market Lake Canal?

It is owned by the State Highway Agency.