US Bridges

N 2100 E over Egin Canal

Good

Fremont County, Idaho · 1.0 E. Parker · Structure no. 000000000031951

Built
2010
15 years old
Condition
Good
inspected November 2024
Type
Frame
Concrete
Length
28 ft
1 main span
Daily traffic
150
2023 count
Owner
County
County Highway Agency

About this bridge

N 2100 E over Egin Canal is a concrete frame carrying N 2100 E over Egin Canal in Fremont County, Idaho. It was built in 2010, so it is 15 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, roughly 5% of them trucks, projected to reach 225 by 2039. The structure is 28 ft (8.5 m) long and 39 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesN 2100 E
CrossesEgin Canal
Location1.0 E. Parker
RouteCounty Highway 0
StateIdaho
Coordinates43.957, -111.73797
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating83 US tons
Inventory rating49.1 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length28 ft (8.5 m)
Longest span28 ft (8.5 m)
Deck width39 ft (11.8 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2023)
Projected traffic225 by 2039
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was N 2100 E over Egin Canal built?

It was built in 2010, making it 15 years old in 2025.

What condition is N 2100 E over Egin Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does N 2100 E over Egin Canal carry?

About 150 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is N 2100 E over Egin Canal?

The structure is 28 ft (8.5 m) long with a longest span of 28 ft (8.5 m) and a deck 39 ft wide.

Who owns N 2100 E over Egin Canal?

It is owned by the County Highway Agency.