Stc 6774;N 2400 E over Salem Union Canal
FairFremont County, Idaho · In ST Anthony · Structure no. 000000000021055
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected November 2022
- Type
- Frame
- Concrete
- Length
- 34 ft
- 1 main span
- Daily traffic
- 1,900
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Stc 6774;N 2400 E over Salem Union Canal is a concrete frame carrying Stc 6774;N 2400 E over Salem Union Canal in Fremont County, Idaho. It was built in 1986, so it is 39 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,900 vehicles a day, roughly 14% of them trucks, projected to reach 2,850 by 2042. The structure is 34 ft (10.4 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stc 6774;N 2400 E over Salem Union Canal built?
It was built in 1986, making it 39 years old in 2025.
What condition is Stc 6774;N 2400 E over Salem Union Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2022.
How much traffic does Stc 6774;N 2400 E over Salem Union Canal carry?
About 1,900 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is Stc 6774;N 2400 E over Salem Union Canal?
The structure is 34 ft (10.4 m) long with a longest span of 34 ft (10.4 m) and a deck 55 ft wide.
Who owns Stc 6774;N 2400 E over Salem Union Canal?
It is owned by the County Highway Agency.