Stc 6862;MAIN ST over Beaver Creek
FairClark County, Idaho · In Dubois;main ST · Structure no. 000000000021165
- Built
- 1953
- 72 years old
- Condition
- Fair
- inspected July 2024
- Type
- Frame
- Concrete
- Length
- 22 ft
- 1 main span
- Daily traffic
- 760
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Stc 6862;MAIN ST over Beaver Creek is a concrete frame carrying Stc 6862;MAIN ST over Beaver Creek in Clark County, Idaho. It was built in 1953, so it is 72 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 760 vehicles a day, roughly 15% of them trucks, projected to reach 1,140 by 2042. The structure is 22 ft (6.7 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stc 6862;MAIN ST over Beaver Creek built?
It was built in 1953, making it 72 years old in 2025.
What condition is Stc 6862;MAIN ST over Beaver Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Stc 6862;MAIN ST over Beaver Creek carry?
About 760 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is Stc 6862;MAIN ST over Beaver Creek?
The structure is 22 ft (6.7 m) long with a longest span of 22 ft (6.7 m) and a deck 60 ft wide.
Who owns Stc 6862;MAIN ST over Beaver Creek?
It is owned by the City or Municipal Highway Agency.