I 86 Ebl over I 84 Wbl
GoodCassia County, Idaho · 13.8 E Burley · Structure no. 000000000010593
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected September 2022
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 452 ft
- 4 main spans
- Daily traffic
- 19,000
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I 86 Ebl over I 84 Wbl is a prestressed concrete continuous box beam or girders - single or spread carrying I 86 Ebl over I 84 Wbl in Cassia County, Idaho. It was built in 2020, so it is 5 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 19,000 vehicles a day, roughly 42% of them trucks, projected to reach 28,500 by 2042. The structure is 452 ft (137.8 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 86 Ebl over I 84 Wbl built?
It was built in 2020, making it 5 years old in 2025.
What condition is I 86 Ebl over I 84 Wbl in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2022.
How much traffic does I 86 Ebl over I 84 Wbl carry?
About 19,000 vehicles per day (2023 count), of which roughly 42% are trucks.
How long is I 86 Ebl over I 84 Wbl?
The structure is 452 ft (137.8 m) long with a longest span of 130 ft (39.6 m) and a deck 44 ft wide.
Who owns I 86 Ebl over I 84 Wbl?
It is owned by the State Highway Agency.