Stc 3875;TEN Davis over Farmers Coop Sebree Cnl
FairCanyon County, Idaho · 2.3 N. 1.5 W. Notus · Structure no. 000000000027450
- Built
- 1954
- 71 years old, rebuilt 1983
- Condition
- Fair
- inspected February 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 33 ft
- 1 main span
- Daily traffic
- 180
- 2023 count
- Owner
- Local
- Other Local Agency
About this bridge
Stc 3875;TEN Davis over Farmers Coop Sebree Cnl is a prestressed concrete tee beam carrying Stc 3875;TEN Davis over Farmers Coop Sebree Cnl in Canyon County, Idaho. It was built in 1954 and reconstructed in 1983, so it is 71 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 180 vehicles a day, roughly 6% of them trucks, projected to reach 270 by 2042. The structure is 33 ft (10.1 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stc 3875;TEN Davis over Farmers Coop Sebree Cnl built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1983.
What condition is Stc 3875;TEN Davis over Farmers Coop Sebree Cnl in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Stc 3875;TEN Davis over Farmers Coop Sebree Cnl carry?
About 180 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is Stc 3875;TEN Davis over Farmers Coop Sebree Cnl?
The structure is 33 ft (10.1 m) long with a longest span of 32 ft (9.8 m) and a deck 32 ft wide.
Who owns Stc 3875;TEN Davis over Farmers Coop Sebree Cnl?
It is owned by the Other Local Agency.