US Bridges

Hop Road over Farmers Coop Sebree Cnl

Fair

Canyon County, Idaho · 0.2 N. 1.3 E. Notus · Structure no. 000000000027285

Built
1986
39 years old
Condition
Fair
inspected February 2023
Type
Frame
Concrete
Length
32 ft
1 main span
Daily traffic
90
2023 count
Owner
Local
Other Local Agency

About this bridge

Hop Road over Farmers Coop Sebree Cnl is a concrete frame carrying Hop Road over Farmers Coop Sebree Cnl in Canyon County, Idaho. It was built in 1986, so it is 39 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 90 vehicles a day, roughly 10% of them trucks, projected to reach 135 by 2039. The structure is 32 ft (9.8 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesHop Road
CrossesFarmers Coop Sebree Cnl
Location0.2 N. 1.3 E. Notus
RouteCounty Highway 0
StateIdaho
Coordinates43.72717, -116.77286
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating38 US tons
Inventory rating23 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span32 ft (9.8 m)
Deck width32 ft (9.8 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic90 (2023)
Projected traffic135 by 2039
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Hop Road over Farmers Coop Sebree Cnl built?

It was built in 1986, making it 39 years old in 2025.

What condition is Hop Road over Farmers Coop Sebree Cnl in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does Hop Road over Farmers Coop Sebree Cnl carry?

About 90 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Hop Road over Farmers Coop Sebree Cnl?

The structure is 32 ft (9.8 m) long with a longest span of 32 ft (9.8 m) and a deck 32 ft wide.

Who owns Hop Road over Farmers Coop Sebree Cnl?

It is owned by the Other Local Agency.