US Bridges

Marsing Road over Deer Flat High Line Cnl

Good

Canyon County, Idaho · 2.2 S. 7.3 W. Nampa · Structure no. 000000000027196

Built
2003
22 years old
Condition
Good
inspected March 2023
Type
Frame
Concrete
Length
28 ft
1 main span
Daily traffic
570
2023 count
Owner
Local
Other Local Agency

About this bridge

Marsing Road over Deer Flat High Line Cnl is a concrete frame carrying Marsing Road over Deer Flat High Line Cnl in Canyon County, Idaho. It was built in 2003, so it is 22 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 570 vehicles a day, roughly 16% of them trucks, projected to reach 855 by 2042. The structure is 28 ft (8.5 m) long and 50 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesMarsing Road
CrossesDeer Flat High Line Cnl
Location2.2 S. 7.3 W. Nampa
RouteCounty Highway 0
StateIdaho
Coordinates43.54581, -116.70747
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99.9 US tons
Inventory rating68 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length28 ft (8.5 m)
Longest span28 ft (8.5 m)
Deck width50 ft (15.2 m)
Roadway width48 ft (14.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic570 (2023)
Projected traffic855 by 2042
Trucks16%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Marsing Road over Deer Flat High Line Cnl built?

It was built in 2003, making it 22 years old in 2025.

What condition is Marsing Road over Deer Flat High Line Cnl in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Marsing Road over Deer Flat High Line Cnl carry?

About 570 vehicles per day (2023 count), of which roughly 16% are trucks.

How long is Marsing Road over Deer Flat High Line Cnl?

The structure is 28 ft (8.5 m) long with a longest span of 28 ft (8.5 m) and a deck 50 ft wide.

Who owns Marsing Road over Deer Flat High Line Cnl?

It is owned by the Other Local Agency.