SMA7743;OLD HWY 30 over Notus Canal
FairCanyon County, Idaho · 2.0 N. 0.1 W. Caldwell · Structure no. 000000000027101
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 32 ft
- 1 main span
- Daily traffic
- 2,100
- 2023 count
- Owner
- Local
- Other Local Agency
About this bridge
SMA7743;OLD HWY 30 over Notus Canal is a prestressed concrete stringer/multi-beam or girder carrying SMA7743;OLD HWY 30 over Notus Canal in Canyon County, Idaho. It was built in 1993, so it is 32 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,100 vehicles a day, roughly 6% of them trucks, projected to reach 3,150 by 2042. The structure is 32 ft (9.8 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SMA7743;OLD HWY 30 over Notus Canal built?
It was built in 1993, making it 32 years old in 2025.
What condition is SMA7743;OLD HWY 30 over Notus Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does SMA7743;OLD HWY 30 over Notus Canal carry?
About 2,100 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is SMA7743;OLD HWY 30 over Notus Canal?
The structure is 32 ft (9.8 m) long with a longest span of 31 ft (9.4 m) and a deck 32 ft wide.
Who owns SMA7743;OLD HWY 30 over Notus Canal?
It is owned by the Other Local Agency.